Wednesday, April 3, 2019

Building Information Model in Energy Performance

Building Information Model in Energy instruction executionCHAPTER 3 RESEARCH METHODOLOGYCHAPTER 3 RESEARCH METHODOLOGY gatewayBuilding Information Model do-nothing be utilise in various stages from feasibility bailiwick to demolition stage. The application of BIM in force doing and deportment bike cost sagaciousness be presented in this research. According to Grilo and Jardim-Goncalves (2010), Building Information Modelling rear end be applied to the fancy of efficiency fulfillance of a mental synthesis and to evaluate the passing between various construction materials of the envelope. BIM becomes possible to prize the performance of the life hertz cost of the edifice in the early design stages.To oeuvre the benefits and ambiguous of the integrating of the BIM and Life Cycle Cost Assessment, the postal code- rescue performance of the furnish wall system was focuse to have appraisement in yearbook push button consumption , by using BIM bundles. Through the a ppraisal of energy consumption, the Life Cycle Cost of HVAC system and lighting system of the moneymaking(prenominal) expression can be evaluated.Research FrameworkTo fulfill the aims of the research, an all-around(prenominal) research on the integration of BIM and life roulette wheel cost assessment containing literature review, pilot study with its results, discussion, conclusions and recommendation. The research framework is illustrated as get in 3.2.1.Literature ReviewThe purpose of the literature review is to study active the BIM application in the construction industry in recent years. Besides, practice session other literatures before pilot study can comprehend the cognition or so(predicate) the definition of BIM, formulas of life cycle cost and the appendage to assess the energy saving performance of mantle wall via the BIM environment. Besides, the definition, merits and elements of life cycle cost have been studied in the review. Some relevant books, journals and text file are the major sources of literature review in this paper.Data parade and Practicability of fell translateIn this stage, a commercial twist with curtain wall system is selected to have pilot study in this paper. Architectural 2D drawings of the build and some detail study ab come out of the closet the construction should in like manner be smooth at this stage. Furthermore, various data about curtain wall should be amassed, such(prenominal) as the blend coefficient and the lighting transmittance of certain curtain wall systems of the commercial building. by and by the preparatory study of the data and drawings, the practicability of conducting the pilot study can be assessed. The examination of BIM softwares which can be adopted in this study should also be conducted at this stage.Development of Building ModelWith the collected 2D drawings of the commercial building, the floor plans of the buildings are converted to a 3D model drawing by entering those dimension s to eQUEST. aft(prenominal) that other information about curtain wall system, such as the type and specification of curtain wall system, should be inputted to the software.Conducting Pilot Study understate of the Pilot StudyIn Hong Kong, around 66% of electricity consumption was apply by the commercial sector. In order to investigate the energy saving measure of the commercial sector, a commercial building with a curtain wall system which is one of the current methods to save electricity is the targeted building in this study. The design and layout out of the building assessed is similar to the commercial building nowadays. Besides, ten types of curtain wall are selected to be assessed with the target building and the cost data of those curtain wall systems are collected from adviser firms and contractors. In this pilot study, there are three sustainable performance assessments. With the integration of BIM and the pilot study, the annual energy consumption of the commercial bui lding can be assessed with the use of BIM. After the assessment of performance, the life cycle cost which is used to assess the cost of an asset over a specified period of time can be calculated.Table 3.6.1 Background Information about Pilot StudyAssessmenteQUEST is used to assess the energy performance of the targeted building. Three assessments are included in energy assessment and they are i) kinship between U- apprise and energy consumption of HVAC system, ii) relationship between shading coefficient and HVAC system and iii) visible transmittance and lighting system. After the energy performance assessment, an economic performance assessment would be conducted. The value of energy consumption obtained by eQUEST in chapter 6 will also be used to calculate the life cycle cost of the building with the use of Microsoft Excel 2013. About the detail processes of calculating life cycle cost, they will be discussed in Chapter 7.Softwares Adopted in Pilot StudyeQUESTeQUEST is a 6D BIM s oftwares that provides whole building energy performance assessment. It is widely used and popular in United States and Canada because of its high accuracy. With its wizards and dynamic defaults, eQUEST can apace conduct whole-building performance simulation analysis and generate various energy consumption reports, such as Annual Energy Consumption by Enduse report. Besides, eQUEST is able to assess the performance of building throughout the entire design process, from the conceptual stage to the final stage of design. About the simulation locomotive engine of eQUEST, DOE 2.2 is also popular within various BIM softwares because of its widely used. expire but not least, eQUEST has been tested according to ASHRAE Standard 140 which is a well-known international standard.Microsoft Excel 2013Microsoft Excel is a spreadsheet software develop by Microsoft. It has been widely used in different industry because of its uncivilized application in calculation and graphing tools. Apart fro m the special features of forming two-dimensional and a very limited three-dimensional graph, Microsoft Excel still has the basic features of spreadsheet, such as using the numbered rows and the numbered columns to define the location of the cells.Declaration for Software sufferanceIt is declared that this paper has no relationship or connection with the developer of software mentioned above, namely, eQUEST and Microsoft. Those softwares have been used because of three reasons. First of all, they are capable to perform the assessment, such as energy consumption assessment, required in this study. Secondly, they are well-known softwares in the construction industry for assessing building performance in energy usage and life cycle cost calculation. Finally, those softwares have veritable education or free visions in which students or the public can download from its official website.DiscussionAfter the sustainable performance assessment via BIM environment, the discussion about the integration of BIM and sustainable assessment will be conducted. The benefits and ambiguous encountered by 6D BIM can be identified in the process of assessment, especially for eQUEST. Furthermore, the results of curtain wall systems in energy and economic boldness will be consolidated and form an overall performance assessment. The most(prenominal) economic, environmental and optimum types of curtain wall system can be selected by different graphs.Conclusion and RecommendationAfter the stage mentioned above, the findings about the features of the curtain wall system and energy consumption can be consolidated at this stage. Also, limitations that restrict the accuracy of the study would be pointed out in chapter 9. Besides, some recommendations for further study about the improvement of the integration between BIM and sustainable assessment of the building would be made.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.